Search found 6 matches

Go to advanced search

by ASpurway
Fri Nov 24, 2017 9:11 am
Forum: Feature Requests
Topic: Print times fix
Replies: 28
Views: 11929

Re: Better Build Time calculation

Fair enough. I do appreciate the problem solving. I just didn't want it to be the end all solution and that no development on simplify's end is required.
by ASpurway
Tue Nov 21, 2017 2:57 pm
Forum: Feature Requests
Topic: Print times fix
Replies: 28
Views: 11929

Re: Better Build Time calculation

Or it should be included in the software that has a print time estimator in it and needs to take into account additional settings. I know I can go to another system but why should I? Since it is available on other (free) services, should it not be a tool that Simplify has internally? Whats the point...
by ASpurway
Wed Nov 15, 2017 9:32 am
Forum: Feature Requests
Topic: Material Usage Display
Replies: 2
Views: 1627

Material Usage Display

It would be very advantageous have simplify break down the amount of all materials individually on the G-Code page. Currently there is only the total weight and length of filament used. I have a dual extruder set-up and I want to know before I start a build, how much of each filament I am going to c...
by ASpurway
Wed Nov 15, 2017 9:15 am
Forum: Feature Requests
Topic: More Speed Options
Replies: 20
Views: 9773

Re: More Speed Options

This would be nice.
by ASpurway
Wed Nov 15, 2017 9:14 am
Forum: Feature Requests
Topic: Adaptive infill, please
Replies: 28
Views: 13527

Re: Adaptive infill, please

This is very important. Cura has it, and it is free. I am printing on a large format printer with build time and material costs in days and multi KGs. It would be great to cut down on what is essentially wasted filament and time while still getting good surface finishes.
by ASpurway
Wed Nov 15, 2017 9:10 am
Forum: Feature Requests
Topic: Print times fix
Replies: 28
Views: 11929

Re: Better Build Time calculation

This is very important. I am working with a large format printer (1mx1mx1m) and the difference between knowing a 50hr build will be more like a 70hr build is very important. This affects scheduling of personnel for finishing, print delivery, and scheduling the next job. It is not acceptable that fre...

Go to advanced search